September 9, 2017

Please reload

Recent Posts

Introducing the METUS CityMulti N-Generation

January 22, 2019

1/3
Please reload

Featured Posts

Reagan Airport Gets New Boilers

July 3, 2015

THE CHALLENGE

Remove two aging and outdated boilers in Term

 

 

inal A with the installation of four state-of-the-art condensing boilers requiring 16,000 million BTU/HR.

 
THE SOLUTION

The new boilers will contribute to Metropolitan Washington Airport Authorities goals of reduced emissions, reduced carbon foot print and decreased energy cost. Approximately 50% reduction in gas usage and saving of $30,000.00 per season. Boilers cost payback will be approximately in 10 years. Bill Oskouee, Lead mechanical design engineer and construction manager for Reagan Airport member of green team.

Tags:

Share on Facebook
Share on Twitter
Please reload

 
Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

Toll-Free: 800.559.2665

Office: 443.561.1600

Fax: 443.561.1601 | 443.561.1617

Email: info@chesapeakesystems.com

  • Grey LinkedIn Icon
  • Grey Facebook Icon
  • Grey Twitter Icon
  • Grey YouTube Icon

NAICS code(s): 423730 &  423720

© 2019 by Chesapeake Systems, LLC